Background
Wind power generation resources abound in China
among which about 253 million kilowatts are available
for development, equaling 1.4 times of the total
installed capacity in 1993. It can be supplementary
to other energy in distribution of season and
geographical position. Wind power generation is
one of the renewable energy, which is comparatively
economic, and easily to be realized in large-scale
commercial production at present. The outline
made by ¡°three commissions¡± pointed out the installed
capacity of wind power generation in China will
reach 1 million kilowatts by 2010. In order to
realize this
objective, several hundred sets of 200-500 kilowatt
or larger wind power generators will be required.
During the period of ¡° the Eighth Five Year Plan¡±,
China has developed the 55-kilowatt and 200 kilowatt
wind power generators and has introduced the technology
of 250 kilowatts wind power generator. At present,
the power of single machine exceeds 500 kilowatts
for the commercialized wind power generator. Large-scale
wind power generators in foreign countries are
comparatively advanced in integral technical level,
which have been realized its
microcomputer control and no man on duty with
high reliability. But the value to introduce generators
is rather high, over 10,000 Yuan per kilowatt.
In order to develop the wind power sector, it
is imperative to be innovative in approaching
to realize the industrial production in China
on the basis of digestion and absorption of the
introduced technology.
2.
Objectives
In order to provide large-scale, reliable and
low-cost generating sets for rapid development
of the wind power fields, in the period of ¡° the
Ninth Five-year Plan¡±, it is imperative to accomplish
the manufacturing of the commercialized sample
machines of the 200-300 kilowatt wind power generating
sets, and to upgrade their rate of nationalization.
Focus should be considered on the breakthrough
of the technology on the complete machine design,
vanes and controllers, making it practical in
the technical level and operation reliability
of the complete machines and possible in the mass
production. Moreover, efforts must be done to
develop 500-600 kilowatt wind power generators
on the basis of digestion and absorption of the
introduced technology and equipment. In making
out plans of technologies, in line with the global
development trend, technical reservations must
be given for the development of the megawatt-grade
wind power generators after the year 2000 in order
to make it possible to install such capacity of
power generator in the wind power fields in early
of the 21st century and to form a large wind power
market in which the Chinese-made generating sets
occupy the majority.
3.
Content
Research and development should be conducted on
the complete design of the wind generator and
its manufacturing process, design on vanes and
its manufacturing process and control technology
of the wind power generating sets.
-
Finalize
200-300 kilowatt grade wind power generating
sets, upgrade their nationalized rate, realize
microcomputer controlling, raise operational
reliability (utilization rate reaching 95
per cent) and anti-interference ability, and
make it possible in mass production.
-
Develop
500-600 kilowatt grade wind power generating
sets
Wind
Power Field and Related Technology On Power System
1.
Background
The wind power generation is particular originating
from its randomness of wind force, so it is necessary
to study the new methods and technology of random
power of the generator in the aspects of wind
power field decision-making, trend analysis, stability
calculating, trouble shooting in the power system,
etc. In addition, it still required to investigate
centralized monitoring of wind power fields, its
interference on telecommunications, and varied
interface technology between the wind field and
power systems, and the impact of wind power generation
on the environment.
2.
Objectives
Unveil the varied laws of technology after the
wind-generated electricity connected to the power
system. Put forward the technical plans to settle
the problems, which may cause the electric power
system to deviate from normal operation. Seek
the experience on the assessment of the wind power,
environment and benefits. Realize to effectively
transmit the most possible wind power to the power
system and make planning of large wind power fields
be programmed and scientific in the development
of China¡¯s wind
power sector.
3.
Content
-
Techniques
for selecting sites of the wind power fields
(conditions and criteria)
-
The
optimized arrangement method and control system
of the group wind power generators in the
wind power fields.
-
Research
on operational performance of a single machine
of wind power generator, different features
of wind speed and optimal choice of the capacity